NJAW Picatinny PLC System
$260,750.00
Completion: December 2017
Installation of New SCADA control and PLC cabinets to monitor NJAW sites within Picatinny Arsenal, using cellular and RF antennas for communication.
NY City Supervisory and Control System (NYCTA)
$123,000,000.00
Completed in the year 1994 and is still the active system
Furnished and Installed a Supervisory and Control System for the NYCTA’s data and voice communication requirements in the Boroughs of Manhattan, Bronx, Brooklyn, and Queens. At the time of installation, the NYCTA claimed it as the largest network of its type in the world. The system utilized 3.2 Million feet of Fiber Optic Cable configured in 7 Major Rings. Network Equipment was installed in a total 125 Substations, 8 PBK Rooms, and 3 Head End Control Centers. Daidone has continued to maintain the network equipment since project completion in 1994.
Lincoln Tunnel SCADA System Installation (PANY&NJ)
$16,122,000.00
Completed in the year 2003
This Design Build contract was to Design, Furnish, Install, and Maintain a state of the art Supervisory Control and Data Acquisition System (SCADA). Daidone installed all power and communication systems, primary and backup command centers, and installed all RCU and RTUs at various locations around the facility in all vent buildings on the New York and New Jersey sides. Control system included over 10,000 I/O Points.
GWB Communication Infrastructure Replacement (PANY&NJ)
$8,202,000.00
Completed in the year 2005
Installation of approximately 50,000 feet of exposed PVC coated conduit and 30,000 feet of fiber optic cable from Fletcher Avenue to Amsterdam Avenue on the Eastbound and Westbound roadways to create a new communication ring. Work also included the installation of 12 Structural steel Platforms for future Communication Cabinets to be installed under Contract GWB-480 which was also constructed by Daidone Electric.
George Washington Bridge Communication System Replacement (PANY&NJ)
$5,815,000.00
Completed in the year 2007
The contract work included the installation of 28 new communication nodes throughout and around the GWB Facility. Provisions for the node power safety, and security were installed. All facility information and security systems were cut over from the existing communication system to the new system and tested.
North River Water Pollution Treatment Plant (NYCDEP)
$62,000,000.00
Completed in the year 1992
North River Water Pollution Treatment Plant (NYCDEP)
$36,275,000.00
Completed in the year 1992
Red Hook Water Treatment Plant (NYCDEP)
$23,500,000.00
Completed in the year 1992
Port Authority Bus Terminal Control Upgrades (NJ Transit)
$2,898,000.00
Completed in the year 2011
Perimeter Intrusion Detection System (PIDS) (PANY&NJ)
$2,828,000.00
Completed in the year 2007
Paterson Station Communications Upgrades (NJ Transit)
$1,346,000.00
Completed in the year 2009
ATSCS Sign Controller Rehabilitation (NJTA)
$1,044,000.00
Completed in the year 2005
MASSTR PHASE 2 (NJMC)
$880,000.00
Completed in the year 2013
Lincoln Tunnel DVR/CCTV License Plate Recognition System (PANY&NJ)
$808,000.00
Completed in the year 2009
HT Travel Time System Upgrade (PANYNJ)
$382,000.00
Completed in the year 2013
| |