NJTA A200.393 Lighting Maintenance
$3,390,000.00
Completion: July 2017
Scheduled and on-call installation, troubleshooting, and repairs of roadway lighting and infrastructure for the full length of the Garden State parkway and NJ Turnpike. Some examples or work include the replacement of damaged wire, poles, high mast tower lighting, under-bridge lighting, metered services, load centers, etc. This work also includes the replacement of underground conduit, foundations, and infrastructure. As part of this contract, DEI also serves as a 24-7-365 on-call contractor to assist with emergency situations such as damaged poles, road sinkholes, or damage caused by motor vehicle accidents.
NJTA A200.424 Lighting Maintenance
$4,768,000.00
Expected Completion: December 2019
Daidone continued the operations of contract A200.424 on this project. Scheduled and on-call installation, troubleshooting, and repairs of roadway lighting and infrastructure for the full length of the Garden State parkway and NJ Turnpike. Some examples or work include the replacement of damaged wire, poles, high mast tower lighting, under-bridge lighting, metered services, load centers, etc. This work also includes the replacement of underground conduit, foundations, and infrastructure. As part of this contract, DEI also serves as a 24-7-365 on-call contractor to assist with emergency situations such as damaged poles, road sinkholes, or damage caused by motor vehicle accidents.
Pulaski Skyway Contract #4 (NJDOT)
$209,991,386.00
2014-Ongoing
Working as a joint venture with CCA Civil, the electrical scope of work includes the electrical support and installation of permanent power & lighting along with new ITS devices for the Pulaski Skyway Rehabilitation. Installation includes 194 decorative luminaires, navigation and aviation lighting systems, pier lighting, a temporary highway lighting system while the bridge is under construction, and over 57,000’ of bridge mounted conduit . Contract 4 also includes an array of new ITS devices including (4) Travel Time System Antennas, (2) Dynamic Messaging Signs, over 21,000’ of new Fiber Optic Cable, and (8) Traffic Cameras that will help alert motorists to delays.
PATCO Pole Line and Feeder Replacement (DRPA)
$28,480,000.00
Completed in the year 2013
The purpose of this project was to replace vital railroad power systems dating back to the initial construction of the PATCO High Speed Line in 1969. The scope of work included the replacement of 832 aging wood utility poles, approximately 12 miles along both Eastbound and Westbound tracks, with new composite fiberglass poles; installation of over 200,000 LF of 26.4kV traction power cable and 2.4kV signal power cable and equipment; installation of fiber optic cable, multi-pair copper communications cable and signal control cable; transfer of various existing cables from old to new poles; demolition of wood poles, abandoned cable, power equipment and signal equipment. The scope also included extensive conduit work beneath two viaduct structures, through two tunnels, underground into 32 new pad-mounted 10kVA transformers, 14 new pad-mounted disconnect switches, 10 signal cases and various local and express junction boxes.
Pulaski Skyway Phase 3 (NJDOT)
$3,093,049.30
ONGOING
Electrical support and installation of permanent power & lighting for the Pulaski Skyway Rehabilitation (Contract #3). Installation includes 152 light poles, navigation and aviation lighting systems, pier lighting, temporary highway lighting systems, 16,000 LF of bridge mounted conduit, and three new electrical load centers for power distribution.
Holland Tunnel Lighting, CCTV, and Communications (PANYNJ)
$9,800,000.00
Completed in the year 1990
Rest Area Lighting (NJTA)
$1,925,000.00
Completed in the year 2002
Lincoln Tunnel South Tube 13.8KV Feeder Replacement (PANYNJ)
$1,278,000.00
Completed in the year 2013
Roadway Lighting Systems Upgrade (NJTA)
$1,100,000.00
Completed in the year 2005
Route 21 Viaduct Replacement (NJDOT)
$1,050,000.00
ONGOING
Replacement of Light Poles along Earhart Drive (PANYNJ)
$780,600.00
Completed in the year 2007
New York Penn Station Back Up Feeder and Switchgear
$468,000.00
Completed in the year 2010
Edison Station Park and Ride Lighting (NJ Transit)
$340,000.00
Completed in the year 2010
|
|