
Traffic Signal Intersections
Installation, implementation and construction of systems including but not limited to:
Completed in the year 2008
Installation of New Traffic Signal System at Raymond Plaza East and West and around Penn Station. Work also consisted of installation of Decorative Sidewalks, Granite Curb, and New Paving and Striping.
Complete in the year 2020
Installation of Underground Conduit, Foundations, and Junction Boxes, Sidewalk and Curb replacement, and other underground and roadway excavation at various locations and traffic intersections as directed.
Completed in the year 2019
Replacement of incandescent bulbs with new LEDs at various locations along NJDOT Roadways. This contract includes replacing traffic signal visors with new “snow-scoop” type visors to increase visibility in inclement weather.
Completed in the year 2017 Traffic Signal Intersection Improvements at 13 locations, including (6) entirely new intersections and temporary traffic signal systems. Project also included ADA handicamp ramp improvements and associated sidewalk and curb replacements and upgrades.
Complete in the year 2017
Removal of incandescent bulbs and Installation of LEDs at various locations along NJDOT Roadways.
Complete in the year 2015
Removal of incandescent bulbs and Installation of LEDs at various locations along NJDOT Roadways.
Completed in the year 2014
Replacement and upgrades to traffic signal equipment at 2 intersections. New poles, signal heads, controller, service upgrades, and 2 new solar flashing beacons.
Completed in the Year 2014
The contract work included the creation of an integrated system interconnecting eighteen traffic signals into one Controlled Traffic Signal System (CTSS). This includes the complete replacement of the existing traffic signal systems at five intersections and geometric improvements and signal modifications to seven other intersections. In addition, the project includes the installation of: Six new traffic cameras for the Camera Surveillance System (CSS), four (4) Travel Time System (TTS), two (2) new permanent electronic Dynamic Message Signs (DMS) and fiber optic wireless communication connecting the entire new integrated system to the Statewide Traffic Management Center in Woodbridge.
Completed in the Year 2014
Removal of incandescent bulbs and Installation of LEDs at various locations along NJDOT Roadways.
Completed in the Year 2013
Removal of incandescent bulbs and Installation of LEDs at various locations along NJDOT Roadways.
Completed in the year 2012
Intersection Improvements (6) along Central Ave. including a new intersection, 2 dead-end streets, multiple handicap ramps, Belgian block curb, and sidewalk.
Completed in the year 2010
This NYCDOT “Requirements” Contract included the installation of 150 new intersections which included 500+ new foundations, 500+ new poles, arms and Signals, 40,000 LF of Conduit with the associated restoration, and all associated cabling.
Completed in the year 2013
Intersection improvements for railway integration though 12 various locations including, signals, curb, sidewalk, handicap accessible ramps, and conduit.
Completed in the year 2012
24/7 x 365 Day 2 Year Maintenance Contract to Maintain the Entire Traffic Signal System within the Borough of Staten Island
Completed in the year 2012
24/7 x 365 Day 2 Year Maintenance Contract to Maintain the Entire Traffic Signal System within the Borough of Staten Island
Completed in the year 2011
This NYCDOT “Topics” Contract included the installation of 2200 new ASTC Traffic Signal Controllers at Various Locations in the five boroughs. Work also includes the replacement of 15,000 incandescent bulbs with LEDs bulbs City wide.
Completed in the year 2010
24/7 x 365 Day 2 Year Maintenance Contract to Maintain the Entire Traffic Signal System within the Borough
Completed in the year 2012
Intersection Improvements (7) including multiple handicap ramps, Belgian block curb, and sidewalk.
Completed in the year 2011
Removal of incandescent bulbs and Installation of LEDs at various locations along NJDOT Roadways.
Completed in the year 2010
24/7 x 365 Day 2 Year Maintenance Contract to Maintain the Entire Traffic Signal System within the Borough of Brooklyn
Completed in the year 2010
Reconstruction of an off-ramp of RT 1&9, including highway lighting and traffic signal intersection.
Completed in the year 2008
Installation of (10) Intersections in and around the Bergen Town Center Mall.
Completed in the year 2008
Installation of Battery Backup Systems at 200 Intersections within New York City
Completed in the year 2008
Installed 5 Traffic Signal Intersections around the new Prudential Center in Downtown Newark and connected all via Fiber Optic Cable and to the Future Central Communications Center.
Completed in the year 2007
Installation of Traffic Signal Systems at 10 Intersections including Conduit, Junction Boxes, Foundations, Electrical Services, Poles, Arms, and Signals
Completed in the year 2007
Installation of Traffic Signal Lights, Poles, Arms, Pedestrian Signals, and wire including underground conduit, junction boxes, and foundations at (10) Intersections.
Completed in the year 2006
Installation of Traffic Signal Lights, Poles, Arms, Pedestrian Signals, and wire including underground conduit, junction boxes, and foundations at (12) Intersections.
Completed in the year 2006
The contract work included a computerized traffic control system and fiber optic communications system for all of Southern New Jersey. Project included the installation of 80 miles of FO Cable, 22 Cameras, 11 Variable Message Signs, 89 Traffic Signal Intersections, 230,000 square feet of Milling and Paving, 40,000 Square Feet of Sidewalk, and 265 Traffic Foundations. Also included was the general construction of the South Traffic Operations Room and Computer Communication Room.
Completed in the year 2005
Installation of 19 Traffic Signal Intersections within Hudson County. Work Included all conduit, foundations, traffic poles, electrical services, and roadway excavation and construction. Also Included the installation of Concrete Curb, Sidewalk, and underground water drainage system.
Completed in the year 2002
Installation of Underground Conduit, Foundations, and Junction Boxes, Sidewalk and Curb replacement, and other underground and roadway excavation at various locations and traffic intersections as directed.
Completed in the year 2002
Installation of Underground Conduit, Foundations, and Junction Boxes, Sidewalk and Curb replacement, and other underground and roadway excavation at various locations and traffic intersections as directed.
Completed in the year 2001
Installation of various Traffic Signal Intersections. Work Included all conduit, foundations, traffic poles, electrical services, and roadway excavation. Also Included the installation of Concrete Curb and Sidewalk.
Completed in the year 2000
Installation of various Traffic Signal Intersections. Work Included all conduit, foundations, traffic poles, electrical services, and roadway excavation. Also Included the installation of Concrete Curb and Sidewalk.
Completed in the year 2000
Installation of various Traffic Signal Intersections. Work Included all conduit, foundations, traffic poles, electrical services, and roadway excavation. Also Included the installation of Concrete Curb and Sidewalk.
Completed in the year 2000
Installation of various Traffic Signal Intersections. Work Included all conduit, foundations, traffic poles, electrical services, and roadway excavation. Also Included the installation of Concrete Curb and Sidewalk.
Completed in the year 1998
Furnished and Installed a computerized Traffic Control System along 12 miles of active roadway on Route 1 and 9 in Newark NJ.
Completed in the year 1997
Furnished and Installed a computerized Traffic Control System along 11 miles of active roadway on Route 37 in Toms River NJ.