
Power and Lighting
Installation, implementation and construction of systems including but not limited to:
Ongoing
Electrical Work to support the Replacement of Suspender Ropes and Rehabilitation of Main Cables. Electrical Work includes the Temporary and Permanent Installation of Conduit and Cable Systems for Upper Level and Lower Level Lighting, Receptacles, 5KV Power Feeders, Fiber Optic Communications, Telephone, and other various systems. Other work includes the removal and replacement of Necklace Lights, Installation of a Cable Dehumidification System, Acoustic Monitoring System, Pedestrian Use Path Lighting, Traffic Signals, as well as other work.
Ongoing
Lighting and Power upgrades including the replacement of 601 Lighting Fixtures with new LEDs, 579 New Lighting Poles, the installation of 116,000 LF of new Underground Conduit, and the replacement of over 839,000 feet of wire.
Ongoing
Lighting and Power upgrades including the replacement of 768 Lighting Fixtures with new LEDs, the installation of 62,100 LF of new Underground Conduit, and the replacement of over 772,000 feet of wire. Retrofit of (102) HPS fixtures on 120’ High Mast Poles at Interchange 11, including new custom LED brackets, replacement of wire within the existing pole, replacement of local pole distribution panels, and spall repairs to the existing high mast foundations.
Ongoing
The Work includes the Procurement, Installation, and Testing of (9) New Tunnel Jet Fans; (652) Tunnel Light Fixtures with a new Tunnel Lighting Control System; Head End PLC SCADA Control System Upgrade with new integrated I/O and HMI Screens for additonal systems and functionality.
Completed in the year 2023
Lighting and Power upgrades including the replacement of 386 lighting fixtures with new LEDs, over 29 new light poles, new underdeck lighting on 5 structures, and the replacement of over 730,000 feet of wire.
Completed in the year 2023
Lighting and Power upgrades including the replacement of 627 lighting fixtures with new LEDs, over 65 new light poles, new underdeck lighting on 14 structures, and the replacement of over 650,000 feet of wire.
Completed in the year 2023
The contract work included the Installation of (4) New 5KV 1200A Switchgear Lineups, Medium voltage Cabling, Terminations, Splicing, and Testing at NY and NJ Towers. Coordination, Phasing, and Cutover from Existing to New SWGR while maintaining GWB operations and eventual Decommissioning and removal of existing Switchgear.
Completed in the year 2017
Scheduled and on-call installation, troubleshooting, and repairs of roadway lighting and infrastructure for the full length of the Garden State parkway and NJ Turnpike. Some examples or work include the replacement of damaged wire, poles, high mast tower lighting, under-bridge lighting, metered services, load centers, etc. This work also includes the replacement of underground conduit, foundations, and infrastructure. As part of this contract, DEI also serves as a 24-7-365 on-call contractor to assist with emergency situations such as damaged poles, road sinkholes, or damage caused by motor vehicle accidents.
Completed in the year 2019
Daidone continued the operations of contract A200.424 on this project. Scheduled and on-call installation, troubleshooting, and repairs of roadway lighting and infrastructure for the full length of the Garden State parkway and NJ Turnpike. Some examples or work include the replacement of damaged wire, poles, high mast tower lighting, under-bridge lighting, metered services, load centers, etc. This work also includes the replacement of underground conduit, foundations, and infrastructure. As part of this contract, DEI also serves as a 24-7-365 on-call contractor to assist with emergency situations such as damaged poles, road sinkholes, or damage caused by motor vehicle accidents.
Completed in the year 2013
The purpose of this project was to replace vital railroad power systems dating back to the initial construction of the PATCO High Speed Line in 1969. The scope of work included the replacement of 832 aging wood utility poles, approximately 12 miles along both Eastbound and Westbound tracks, with new composite fiberglass poles; installation of over 200,000 LF of 26.4kV traction power cable and 2.4kV signal power cable and equipment; installation of fiber optic cable, multi-pair copper communications cable and signal control cable; transfer of various existing cables from old to new poles; demolition of wood poles, abandoned cable, power equipment and signal equipment. The scope also included extensive conduit work beneath two viaduct structures, through two tunnels, underground into 32 new pad-mounted 10kVA transformers, 14 new pad-mounted disconnect switches, 10 signal cases and various local and express junction boxes.
Complete in the year 2015
Electrical support and installation of permanent power & lighting for the Pulaski Skyway Rehabilitation (Contract #3). Installation includes 152 light poles, navigation and aviation lighting systems, pier lighting, temporary highway lighting systems, 16,000 LF of bridge mounted conduit, and three new electrical load centers for power distribution.
Completed in the year 1990
Completed in the year 2002
Completed in the year 2013
Completed in the year 2005
ONGOING
Completed in the year 2007
Completed in the year 2010
Completed in the year 2010