Civil and General Contracting
Heavy Civil and General Contracting work including but not limited to:
Completed in the year 2011
Contract work included the installation of a new drainage system with over 6,000 LF of RCCP, 120 Drainage Structures, and 2 Detention Basins. Flatwork included the installation of 2,000 SY of Sidewalk, 1,700 SY of Brick Pavers, and 16,000 LF of curb on Route 206 in Chester. Work also included the installation of a 750′ Long Decorative Retaining Wall with a hand installed stone veneer finish installed by master masons. Road work included the realignment of Maple Ave, a new Connector Road, widening of the Route 206NB Roadway, a new Traffic Signal Intersection, Gas and Water Utility relocations, Highway Lighting, Landscaping, and Milling and Paving throughout the entire contract limits.






Completed in the year 2018
Replacement of 3 Under Track Platform exhaust fans including, fan drives, ductwork, dampers, power upgrades, and SCADA tie in.
Completed in the year 2008
Contract work included the installation of 22,000 SY of decorative sidewalks and pavers, 20,000 LF of Curb , 1200 LF of Belgium Block Curb, granite curb, , decorative light poles, landscaping, and drainage improvements throughout the cities of Union and Elizabeth. Contract also included traffic signalization of (4) intersections, Gas and Water Utility relocations, and Milling and Paving throughout the entire Contract limits including 14,000 Tons of Asphalt.

Completed in the year 2010
Completed in the year 2005
Completed in the year 2005
Completed in the year 1998